QUESTION 1
When a transfer device is used to connect a portable and/or standby generator to feed essential loads in residential applications, the transfer device is required:

a) to be approved for the purpose
b) adequate to supply essential loads
c) to ensure no backfeed to utility supply
d) all of the above.

QUESTION 2
Vertical runs of #1/0 AWG copper TECK90 cables shall have the internal cable assembly supported at maximum intervals of:

a) 5 m
b) 10 m
c) 30 m
d) 24 m

QUESTION 3
Two 15A, 120V-rated single-pole breakers are permitted to have their handles mechanically interlocked onsite to protect a 15A, 240V three-wire branch circuit.

a) True
b) False

Answers to this month’s questions in May’s Electrical Business. MEANTIME, here are the answers to the March 2018 Code Conundrum!



Question 1
Single-phase inverters for an interactive solar photovoltaic system are not permitted to be connected to 3-phase systems, unless:

d) all of the above. Rule 64-110, CE Code 2018.

Question 2
Bare or insulated conductors not enclosed in grounded metal shall be used in service rooms accessible only to authorized persons.

a) True. Rule 36-100, CE Code 2018.

Question 3
Where batteries are used as a source of the emergency power supply, the batteries shall be kept in proper condition and charged 50% (minimum) at all times.

b) False. Rule 46-104, CE Code 2018.

How did YOU do?

3/3 = Master Electrician
2/3 = Journeyman
1/3 = Apprentice
0/3 = Bricklayer?!?

Add comment


Security code
Refresh

Subscription Centre

 
New Subscription
 
Already a Subscriber
 
Customer Service
 
View Digital Magazine Renew





We are using cookies to give you the best experience on our website. By continuing to use the site, you agree to the use of cookies. To find out more, read our Privacy Policy.